SYSTEM SIZE

1.627 MW

ANNUAL GENERATION

2.18 GWh

SEQUESTRATION EQUIVALENT

1,813 acres of forest

COAL REPLACEMENT

1,684,068 lbs. not burned

Four Warehouses with One Common Solar Goal

Through creative innovation, Aurora Energy was able to customize each tailored design according to roof space and offset needs resulting in a 96.6 kW system at the CPAD warehouse; 277.2 kW system at Port Services; 529.2 kW at Black Ice warehouse and 724.5 kW at Blue Stripe warehouse.  The system installed at the Blue Stripe warehouse is the largest roof mounted solar array in Virginia’s Shenandoah Valley.

customer's goals

In order to reduce costs for four of their cold storage & shipping warehouses in Virginia, InterChange Group was looking for a solar solution as a way to maximize their rooftop space. InterChange tasked Aurora with desiging and installing rooftop solar arrays at all four warehouses that fit the needs of each particular site.

aurora's solution

Through creative innovation, Aurora Energy was able to customize each tailored design according to roof space and offset needs resulting in a 96.6 kW system at the CPAD warehouse; 277.2 kW system at Port Services; 529.2 kW at Black Ice warehouse and 724.5 kW at Blue Stripe warehouse.

project results

The total aggregate generation for the four sites is 2,178.4 MWh of electricity annually, feeding any excess back into the grid. Over the lifetime of the systems, over 38,000 metric tons of carbon dioxide will be off-set. In addition, the system installed at the Blue Stripe warehouse is the largest roof mounted solar array in Virginia’s Shenandoah Valley.

Cropped CPAD array strip
DCIM100MEDIADJI_0225.JPG
brochure cover PM
DCIM100MEDIADJI_0216.JPG
Black Ice roof level array pic rect
DCIM100MEDIADJI_0298.JPG
Rectangle cropped no clutter
Port Services web photo
DCIM100MEDIADJI_0154.JPG
Photo Oct 01, 2 13 43 PM
DCIM100MEDIADJI_0216.JPG
DCIM100MEDIADJI_0249.JPG
DCIM100MEDIADJI_0246.JPG
DCIM100MEDIADJI_0242.JPG
DCIM100MEDIADJI_0233.JPG
DCIM100MEDIADJI_0230.JPG
DCIM100MEDIADJI_0225.JPG
DCIM100MEDIADJI_0222.JPG
DCIM100MEDIADJI_0220.JPG
DCIM100MEDIADJI_0218.JPG
previous arrow
next arrow
Cropped CPAD array strip
DCIM100MEDIADJI_0225.JPG
brochure cover PM
DCIM100MEDIADJI_0216.JPG
Black Ice roof level array pic rect
DCIM100MEDIADJI_0298.JPG
Rectangle cropped no clutter
Port Services web photo
DCIM100MEDIADJI_0154.JPG
Photo Oct 01, 2 13 43 PM
DCIM100MEDIADJI_0216.JPG
DCIM100MEDIADJI_0249.JPG
DCIM100MEDIADJI_0246.JPG
DCIM100MEDIADJI_0242.JPG
DCIM100MEDIADJI_0233.JPG
DCIM100MEDIADJI_0230.JPG
DCIM100MEDIADJI_0225.JPG
DCIM100MEDIADJI_0222.JPG
DCIM100MEDIADJI_0220.JPG
DCIM100MEDIADJI_0218.JPG
previous arrow
next arrow
Shadow
Secure Futures solar installation case study Aurora Energy
Secure Features Case Study PDF

Ready to take the first step?

Get a complimentary contact-free quote

This website uses cookies to ensure you get the best user-experience possible.